LAYING DOWN PIPE
The operation of pulling drill pipe or tubing from the hole and laying it down on the pipe rack.

LEASE
A legal document executed between a landowner, as lessor, and a company or individual (as lessee) that conveys the right to exploit the premises for minerals or other products for a specified period of time over a given area.

LEASE SALE
An MMS proceeding by which leases of certain OCS tracts are offered for lease by competitive sealed bidding and during which bids are received, announced, and recorded.

LIQUIDS
Hydrocarbons in solution in natural gas which are liquefiable at surface temperature and pressure or by treatment and processing.

LITHOLOGY
The study of rocks and hence the description of different formations encountered by a well.

LOG/LOGGING
Systematic recording of data. To conduct a survey inside a borehole to gather information about the subsurface formations; the results of such a survey. Logs typically consist of several curves on a long grid that describe properties within the well-bore or surrounding formations that can be interpreted to provide information about the location of oil, gas, and water. Also called well logs, borehole logs, wireline logs.

LOST CIRCULATION
Loss quantities of whole mud to a formation, usually cavernous, fissured, or coarsely permeable beds. It is indicated by the complete or partial loss of drilling mud returns. Until the zone in which the drilling fluid has been lost is sealed off, drilling cannot be resumed in most cases.


MAKING HOLE
Refers to progress being made at a given time when the bit is rotating and the well-bore is being deepened. In other words, drilling.

MAKING A TRIP
Hoisting of the drill string out of, and returning it into, the well bore. This is done for the purpose of changing bits, preparing to take a core, etc.

MAKE UP/BREAK OUT
To assemble/screw together the sections of joints of a string of pipe. 'Breaking out' is the opposite.

MARGINAL
A well, development, etc. whose commercial profitability is in doubt.

MIGRATION
Hydrocarbons are often found in formations other than those in which their organic source was deposited. This movement often over considerable distances is known as migration. A process applied to data recorded, e.g. in a "3-D" seismic survey, to adjust for the effects of the "oblique" angle at which it was gathered.
 
MILLIDARCY
See Darcy

MINIMUM ROYALTY
The lowest payment a lessee can pay on an OCS lease after production begins. It is equivalent to the yearly rental, typically $3 per acre or $8 per hectare. Rentals are paid annually before a discovery; royalties are paid on production after a discovery. If the total royalty payments amount to less than the yearly rental, the minimum royalty payments make up the difference.

MMBBL
Million barrels.

MMBOE
Millions of barrels of oil equivalent.

MMSCFD
Millions of standard cubic feet per day.

MUD
Mud is the name given to drilling fluid which is mainly a mixture of water, or oil distillate, and 'heavy' minerals such as Bentonite or Barites. Mud is pumped into a well at densities calculated to provide a hydrostatic pressure sufficient to overcome downhole formation pressures. (See e.g. Gas Kick). In addition, the mud is continuously circulated down to the bit, and returns in the annular space outside the drill-string, bringing with it rock cuttings for inspection and keeping the well clean. It is also engineered to maintain a thin protective layer of filter-cake on the bore hole wall, without excessive weight which would decrease the weight on the bit and hence penetration ( see Drill String), and also possibly lead to differential sticking and formation damage. Mud is pumped from the mud pit (or tank) via the standpipe, rotary hose and gooseneck to the swivel, and into the drill stem. On return from down hole it is recovered and rock cuttings removed by the shale shakers before re-circulation. A Mud Log is the record of mud make-up and analysis of cuttings recovered.

MULTIPLE ZONE WELL COMPLETION
Completion of a well in such a way that production is obtained from several different formations.


NET PROFIT SHARE LEASE
An OCS lease that provides for payment to the U.S. of a percentage share of the net profits for production of oil and gas from the tract. The percentage share may be fixed in the notice of the lease sale or may be a variable of the bid, depending on the bidding system used for the lease sale.

NODDING DONKEY
The colloquial name for conventional onshore wellhead production beam pumps.


OFFSET WELL
Well location adjoining another well site.
 
OIL IN PLACE (OIP)
See In Place

OIL COLUMN/GAS COLUMN
The vertical distance between points of highest and lowest known oil or gas in a reservoir.
 
OIL/WATER CONTACT
The lower end of the oil column in a reservoir with underlying water. This may be graduated or occur in formations where it is hard to detect.

ON STREAM
When production is flowing, or plant is in operation.

OPEN FLOW
Producing a well without chokes or beans. Unrestricted production normally for testing or maintenance purposes.

OPEN HOLE
An uncased section of well borehole.

OPERATOR
Person, whether proprietor or lessee, who actually operates the well. Generally, the oil company by whom the drilling contractor is engaged.

ASX Announcements

[ View All ]


Entitlement Issue

To view a copy of the Target Energy April 24 2015 Issue Prospectus please click here


BRR Media Broadcasts

BRR Media
Pipeline

Into the Pipeline!

Receive email updates
on the latest news and
Performance from
Target Energy

[ Subscribe ]
Bottom

Contact Details

Principal Place of Business
Suite 5, 6 Richardson Street
West Perth WA  6005

P: +618 9476 9000
F: +618 9476 9099
US Office
1900 St James Place, Suite 425
Houston, Texas, 77056
United States of America

P: +1 713 275 9800
F: +1 713 275 0999
Email To: admin@targetenergy.com.au
ABN: 73 119 160 360
GTP Web Site Design | Stats