Target Energy - Australian petroleum exploration and production company.

Logo
http://www.targetenergy.com.au/ http://www.targetenergy.com.au/ http://www.targetenergy.com.au/ http://www.targetenergy.com.au/

Wharton County, Texas

(click to enlarge)

Merta Gas Field - (Target Energy 25% working interest)


The Merta #1 well, which tested the “Highway 71” prospect, is situated approximately 100 kms west-southwest of Houston in Wharton County. Target has a 25% working interest.

Operated by J. Charles Hollimon ("Hollimon") of San Antonio, Texas, drilling of the Merta #1 well was undertaken in October through December 2009, with production from the Cook Mountain sands commencing on 10 June 2010.

In accordance with the well program Merta #1 was fracture-stimulated on 19 October, 2010. Following the fracture stimulation, production from the Cook Mountain sands has stablised to average approximately 350 - 400 mcfgd with approx 5 BOPD.  Total gas and oil production from this well to 31 December 2010 is 83.0 mmcf and 1,179 BO respectively.

Consideration is now being given to putting the well on compression.


ASX Announcements

FlameFairway and Shepard Channel UpdatesJan 9th 2012

...

FlameChange of AddressJan 6th 2012

....

FlameOperations UpdateDec 14th 2011

...

[ View All ]

Top

Oil & Gas Prices (US$)

Oil (WTI)

$97.26/bbl

Gas (Henry Hub)

$2.410/mcf

Bottom

Presentation


Pipeline

Into the Pipeline!

Receive email updates
on the latest news and
Performance from
Target Energy

[ Subscribe ]
Bottom

Contact Details

Suite 5, 6 Richardson Street
West Perth WA  6005

P: +618 9476 9000
F: +618 9476 9099
E:
admin@targetenergy.com.au
ABN: 73 119 160 360